Third Party Monitoring - Sabkha Water Station Rehabilitation in Syria

The main objective of the consultancy is to oversee the construction activities to ensure they are carried out as per the approved design specifications and within

the agreed timeline and budget. Specifically, the consultant will undertake construction supervision of the contractors work in:
•Establishing floating intakes installed on the infiltration well, along with providing and installing two horizontal pumps with a capacity of 330 m3/hour.
•Constructing 4 concrete water clarifier with a capacity of 240 m3 for each.
•The station is equipped with a unit for aluminium sulphate (alum) dosing and a sterilization unit with sodium hypo chloride.
•Equipping the existing filter units with washing system with air and water
•Rehabilitation of the existing underground reservoir and buildings dedicated to electrical energy
•Installing a drainage

How to apply

to get the needed specifications and Annexes - Pls send an email to: [email protected]

  1. Request for Proposal NRC2024-004
  2. Annex 1 General Terms & Conditions to be signed as a form of acceptance
  3. Annex 2 Requirements/ Terms of reference 
  4. Annex 3 Supplier Registration Form - to be filled in and submitted with your offer
  5. Annex 4 Pricing Annex - to be filled in and submitted with your offer
  6. BoQ, Drawings and Technical Specifications
آخر مدة للتقديم
الأربعاء, 07. أغسطس 2024
نوع الدعوة
دعوة لتقديم الاستشارات
قطاع(ات) التدخل:
نظافة المياه والصرف الصحي
Remuneration range:
< 1000 (USD)
Duration of Contract:
Till December 2024