Site preparation and Mobilization for Hamam Al Nouri Tripoli.

The selected contractor will be responsible for the following:

  1. Assessment and Preparation
    • Conduct a site visit to assess the designated area and verify all items listed in the BOQ.
    • Identify and address any potential execution issues before initiating each task.
  2. Construction and Execution
    • Execute all works in accordance with the BOQ sections and the specified drawings.
    • Ensure that all tasks meet the required specifications and are completed to a high standard.
    • Obtain the consultant’s approval for any design query or material selections prior to execution in coordination with the project team.
    • Conduct commissioning of the completed works in the presence of the project team and promptly address any issues or items on the snag list.
  3. Transportation and Disposal
    • Collect and remove all debris and residues resulting from the works.
    • Safely transport and dispose of waste materials at approved locations, in compliance with local regulations.
    • Maintain a clean and organized site throughout the duration of the project.

 

 

 

  1. Protection of the Building
    • Implement measures to protect the historical building and its surroundings before starting any work.
    • Ensure that no damage occurs to any part of the heritage building during the execution of the works.
  2. Safety Measures
    • Strictly adhere to safety protocols to ensure the well-being of workers and the public.
    • Provide and enforce the use of appropriate personal protective equipment (PPE) at all times during execution

      The selected contractor will be responsible for the following:

    • Assessment and Preparation
      • Conduct a site visit to assess the designated area and verify all items listed in the BOQ.
      • Identify and address any potential execution issues before initiating each task.
    • Construction and Execution
      • Execute all works in accordance with the BOQ sections and the specified drawings.
      • Ensure that all tasks meet the required specifications and are completed to a high standard.
      • Obtain the consultant’s approval for any design query or material selections prior to execution in coordination with the project team.
      • Conduct commissioning of the completed works in the presence of the project team and promptly address any issues or items on the snag list.
    • Transportation and Disposal
      • Collect and remove all debris and residues resulting from the works.
      • Safely transport and dispose of waste materials at approved locations, in compliance with local regulations.
      • Maintain a clean and organized site throughout the duration of the project.
    •  

       

       

    • Protection of the Building
      • Implement measures to protect the historical building and its surroundings before starting any work.
      • Ensure that no damage occurs to any part of the heritage building during the execution of the works.
    • Safety Measures
      • Strictly adhere to safety protocols to ensure the well-being of workers and the public.
      • Provide and enforce the use of appropriate personal protective equipment (PPE) at all times during execution

How to apply

Contractors who wish to participate are invited to submit their proposals by 22/12/2024, no later than 23:00. Any proposals received after this deadline will be disregarded.

Please send your proposal directly to LBN_Tenders@iecd.org. Submitting offers with any other email addresses in CC will result in immediate disqualification.

A mandatory site visit is required before submitting your offer. The visit will take place on Wednesday, 18/12/2024. To schedule your visit, please express your interest by contacting adnan.mawad@iecd.org.